金溝屯18200千瓦水電站項(xiàng)目招商引資
來(lái)源:網(wǎng)群國(guó)際 瀏覽:次
Hydropower Station of 18200 KW in Jingoutun of Luanping County
項(xiàng)目基本情況:建引水?dāng)r河壩150延長(zhǎng)米,開(kāi)鑿1270米無(wú)壓涵洞,建前池,廠(chǎng)房和尾水渠,安裝三套水輪發(fā)電機(jī)組運(yùn)行發(fā)電。電站裝機(jī)容量18900千瓦,設(shè)計(jì)水頭98米,設(shè)計(jì)流量22立方米/秒,年發(fā)電量10300萬(wàn)千瓦/小時(shí)。項(xiàng)目計(jì)劃總投資3000萬(wàn)美元,其中固定資產(chǎn)投資2600萬(wàn)美元,流動(dòng)資金400萬(wàn)美元。資金全部由企業(yè)自籌。項(xiàng)目建成后,年發(fā)電量10300萬(wàn)千瓦時(shí),年銷(xiāo)售收入507萬(wàn)美元,年實(shí)現(xiàn)利稅276萬(wàn)美元。水電是國(guó)家提倡開(kāi)發(fā)的能源,所發(fā)電量全部并入華北電網(wǎng)躉售,市場(chǎng)前景廣闊。
Fundamental Information of Project: Dam and barrage of 150 extension rice were built and non-pressure culvert of 1270m was dug. In the mean time, the forebay, workshop and tail water channel as well as three sets of hydro-generator sets were erected. The hydropower station enjoys an installed capacity of 18900kw, hydraulic head of 98m, design flow of 22 cubic meter/second and annual power generation of 103 million KW/hour. With a total investment of USD30million, the Project enjoys a fixed asset investment of USD26million and flow capital valuing at USD4million. All funds shall be collected by enterprises themselves. After completion, the Project will realize an annual electricity generation capacity of 103 million KW/hour, annual sales income of USD5.07million and annual tax payment of USD2.76million. Hydroelectricity is a kind of energy advocated by our country. All electric power obtained shall be incorporated into North China Power Grid for bulk sale. Therefore, the market future is bright.
項(xiàng)目建設(shè)條件:該項(xiàng)目位于灤平縣金溝屯鎮(zhèn)荒地村下游的灤河干流右岸,廠(chǎng)址距張百灣35千伏變電站18公里,距縣城37公里,距承德市62公里。項(xiàng)目建成后在張百灣變電站并網(wǎng)。電站為無(wú)調(diào)節(jié)徑流式水電站,站址上游水流域面積1.5萬(wàn)平方公里,平均徑流量為4.54億立方米。
Construction Conditions of Project: The Project locates on the right bank of the main stream of Luanhe River on the lower reaches of Huangdi Village of Jingoutun Town, Luanping County. The factory is 18 km away from transformer station of 35KV, 37km from Luanping County, 62km from Chengde City. After completion, the power generated by the Project will be synchronized in Zhangbaiwan transformer station which is a non-regulation radial flow hydraulic power station. The river on upper reaches of the Project covers an area of 15000sqm, with an average runoff of 454 million cubic meters.
項(xiàng)目進(jìn)展情況:目前,通過(guò)省發(fā)改委立項(xiàng),省水利廳批復(fù)設(shè)計(jì)。
Project Progress: currently, the design of Project has been approved by Provincial Development & Reform Commission and Provincial Department of Water Resources
合作意向:獨(dú)資
Mode of Cooperation: single proprietorship
項(xiàng)目合作:18361148798 或
溫馨提示:本站提供免費(fèi)發(fā)布服務(wù),但對(duì)信息的合法性、實(shí)時(shí)性、真實(shí)性和完整性,不承擔(dān)任何責(zé)任。名錄資源由會(huì)員為向全球展示品牌形象上傳,個(gè)人信息均經(jīng)處理后發(fā)布,如有遺漏戓涉嫌侵權(quán)他人及不愿展示形象的,請(qǐng)將“該頁(yè)網(wǎng)址和需修改及刪除的內(nèi)容”發(fā)至本站郵箱戓留言給我們處理。凡注冊(cè)會(huì)員并發(fā)布信息或名錄資源的,均可定期獲得全球項(xiàng)目參考及合作機(jī)會(huì)。本站名錄資源概不對(duì)任何第三方開(kāi)放,更不提供如交換、出售及查詢(xún)等服務(wù)!
-